STEAMPRO CONSERVATION SDN BHD 396375-U
Tel : +603-8942.1888 / Fax : +603-8943.3057
Email : support@steampro.com.my/    Web : http://www.strempro.com.my/
PRELIMINARY ASSESSMENT FORM (BUILDING ENERGY EFFICIENCY)
This information is used to assess the potential energy savings.
Please complete all fields and return to SteamPro by:
Fax : +603 - 8943 3057       Email : info@steampro.com.my
COMPANY / FACILITY NAME
 
NAME OF CONTACT PERSON & POSITION
 
OFFICE NUMBER MOBILE NUMBER EMAIL
 
BUILDING INFORMATION
Type of Building Factory Hotel Office Building
  Shopping mall Hospital University Campus
Building Area Sq. m
Conditioned Area Sq. m
Building Age
Operating Hours Weekday Mon - Friday
  Weekend Sat - Sun
 
AVERAGE ELECTRICITY
Elec. Usage Demand Charge
Utility Bill Tariff structure
Max Demand    
Note : Please attach latest copies of 12 months latest electricity bills
 
CHILLERS
Total Number of Chillers
Total Chiller Tonnage Installed 1 2 3 4 5 6  
Average Chiller Running Tonnage
 
Chiller Brand, Tonnage, Aty, kW/Ton, type of chiller:
Eg: Trane, 650, 2, 0.58-2 number of 650 Ton Trane at 0.58/Ton, Centrifugal type
 
Chiller Operating Parameters : No of Running Chiller, CWS, CWR, CHWS, CHWR, CHWS Setpoint, % load
 
COOLING TOWERS
Distribution
Total Number of Colling Towers
Any variable speed drive on Tower YES   NO
 
If yes, How is it controlled
 
Brand, Tonnage, Aty, Motor (HP or KW)
Please indicate untis that are normally running and standby units
 
Flow meter magnetic vortex paddle wheel others
       
Temperature sensor RTD PT100 PT1000
  10K Thermistor 30K Thermistor Others
 
Power Meter Digital power meter Kw transducer Others
 
STEAM & HOT WATER SYSTEM (OPTIONAL, IF AVAILABLE) :
Overview
No. Of Floors   No. of Rooms
Average Occupancy %   No. of Restaurant
Seating Capacity      
Full Laundry Services Yes No      
 
Existing System
Type Fuel Type Energy Cost
Steam Boiler + Calorifier Bunker Oil per litre
Hot Water Boiler HSD per litre
Others LPG per kg
    Nat Gas per SM3
    Electricity per KwH
Configuration
No. of Boiler/Heat Machines Running Standby Age
Operating hours/day Steam Production/day
Capacity/Pressure No. of Calorifier
Electrical Boosters Yes No Nos kW    
Hot Water (Estimated) litres/day (Peak) litres/day (avg)
 
Please attach and send to info@steampro.com.my (If possible/available)
1. Electricity, Fuel bills &Occupancy level for the past twelve months
2. Building M&E Drawings (If possible) -PID Diagrammes, Building Layout
3. Chilled Water / Air Conditioning / Steam / Hot Water Disctribution Drawings